Flat Lake Gas Processing Facility
On January 20, 2020, Steel Reef gained ownership and operatorship of a gas processing facility at Flat Lake, in southeast Saskatchewan, near the U.S.-Canadian border. Flat Lake is connected to a sales gas pipeline that connects to the Saskatchewan Ethane Extraction Plant (SEEP).
Facility Specifications
Combined licenced capacity – 12 MMcf/d
Ownership Interests
Steel Reef – 100%
Product Deliveries
C3, C4 and C5+ – trucked out
Product Recoveries
C3 – 73%
C4 – 93%
C5+ – 99%
Associated Pipeline
41 kilometers