←Return

Plato pipeline           

The Plato pipeline is a 57.2 km pipeline network built in 2014 by Steel Reef. The pipeline allows up to 15,000 bbl/d of oil from the Viking formation of the WCSB to be transported from an oil battery near the community of Plato in southwest Saskatchewan to an oil gathering tank farm system in Kindersley, Saskatchewan.  

Facility Specifications:

Transports Viking oil production.

Ownership Interest:

60% working interest in mainline and storage

100% working interest in connecting lateral

Associated Pipeline:

57.2 kms of pipeline in total.